Feature

●DURABILITY & STRENGTH - Forged from high-grade alloy steel, this crane hook withstands heavy use with a 12-ton breaking force, offering long-lasting lifting reliability.
●LIGHTWEIGHT DESIGN - The hooks low weight-to-strength ratio supports heavy loads effortlessly, proving indispensable for high-stakes industrial tasks.
●VERSATILITY - The 360° rotating hook ensures flexibility and ease-of-use across applications such as factory work, trailer transport, and bridge construction.
●USER-FRIENDLY - Featuring a large opening and standard sizing, the hook accommodates various rigging accessories for streamlined operations.
●SAFETY-ORIENTED - Rigorously tested for operation stability, this crane hook aligns with safety protocols to avoid impact-related hazards in the workplace.


Description

Feature:

DURABILITY & STRENGTH - Forged from high-grade alloy steel, this crane hook withstands heavy use with a 12-ton breaking force, offering long-lasting lifting reliability.
LIGHTWEIGHT DESIGN - The hooks low weight-to-strength ratio supports heavy loads effortlessly, proving indispensable for high-stakes industrial tasks.
VERSATILITY - The 360° rotating hook ensures flexibility and ease-of-use across applications such as factory work, trailer transport, and bridge construction.
USER-FRIENDLY - Featuring a large opening and standard sizing, the hook accommodates various rigging accessories for streamlined operations.
SAFETY-ORIENTED - Rigorously tested for operation stability, this crane hook aligns with safety protocols to avoid impact-related hazards in the workplace.


Specification:

Item Type: Crane Hook
Material: Alloy steel
Model: SL-H1025
Applicable Scenarios: Factory hoisting, trailers, port transportation, electric power hoisting, construction site construction, bridge construction
Rated Load: 3WLL/T
Breaking Force: 12BL/T
A: Approx. 45mm / 1.8in
B: Approx. 16mm / 0.6in
C: Approx. 39mm / 1.5in
D: Approx. 30mm / 1.2in
E: Approx. 162mm / 6.4in
L: Approx. 209mm / 8.2in



Package List:

1 x Crane Hook


Note:

1. The connection method should be correct when hoisting.
2. Trial hoisting before hoisting, and hoisting can only be carried out after the test hoisting is successful. During the hoisting process, it is required to be stable and impact is strictly prohibited.
3. Spreaders and accessories should not exceed rated lifting capacity, and should not exceed their working load in the corresponding hanging state.